South Florida Real Estate Insights

Building guides, neighborhood comparisons, market reports, and new development coverage.

304 articles · Page 12 of 17

Luxury Living
June 22, 2026
12 min read

Aria Reserve North Tower: Edgewater's Newly Completed 62-Story Bayfront Twin, Buyer's Guide (2026)

Melo Group's Aria Reserve North is the 62-story, 399-residence second tower of Edgewater's twin-tower complex on Biscayne Bay. Reported to have received its Temporary Certificate of Occupancy in October 2026, it is now a finished building buyers can tour, with Arquitectonica architecture, MORADA interiors and flow-through layouts.

new-constructionaria-reserveedgewater+5
Pre Construction
June 22, 2026
10 min read

Aria Reserve Skyclub Edgewater: Melo Group's Planned Final Phase (2026 Pre-Construction Guide)

Aria Reserve Skyclub is the proposed third and final phase of Melo Group's Aria Reserve in Edgewater: a 49-story, roughly 430-unit Arquitectonica mixed-use tower planned for 500 NE 24th Street with about 77,000 sf of office space and 6,924 sf of ground-floor retail. Plans went before Miami's UDRB in June 2025; as of October 2026 no groundbreaking, sales launch, pricing or delivery date has been announced.

pre-constructionaria-reserveskyclub+5
Pre Construction
June 22, 2026
12 min read

Atelier Residences Miami: 2026 The Roads Pre-Construction Buyer's Guide

BLDG Ventures' 10-story, 146-residence boutique condo at 1265 SW 22nd Street on Coral Way, at the edge of The Roads: fully furnished studios to three-bedroom villas, Pfeifer Haus interiors, the CAYA Member's Club and an optional rental program managed by FirstService Residential. The developer reported passing its groundbreaking milestone in August 2026, putting the project in its construction phase, and has not published a delivery date.

pre-constructionatelier-residencesatelier-miami+5
Pre Construction
June 22, 2026
9 min read

Bay Harbor Towers: Pre-Construction Buyer's Guide (2026)

Bay Harbor Towers is PPG Development's 44-residence, Kobi Karp-designed waterfront condo at 10141 East Bay Harbor Drive. It topped off in November 2025 at about 75% sold and is under construction, with the developer listing delivery for early 2027.

pre-constructionbay-harbor-islandsbay-harbor-towers+4
Pre Construction
June 22, 2026
10 min read

Bay Harbor Villas: 20-Townhome Bay Harbor Islands Pre-Construction Buyer's Guide (2026)

Regency Development Group's Bay Harbor Villas, marketed as Bay Villas, plans 20 three- and four-bedroom townhome condominiums at 10190 East Bay Harbor Drive, each with an interior elevator, a two-car garage and a private rooftop terrace. Kobi Karp designs it, developer pricing starts at $2.65M, and no delivery date has been published.

pre-constructionbay-harbor-villasbay-harbor-islands+4
Luxury Living
June 22, 2026
12 min read

Bayview Fisher Island: 2026 Buyer's Guide

Bayview -- the six-building bayfront community at 4811-5391 Fisher Island Drive, delivered in phases between 1990 and 2004 -- pairs 11- to 14-story flow-through residences from 1,950 to 9,570 square feet with full Fisher Island Club access.

fisher-islandbayviewbayview-village+4
Pre Construction
June 22, 2026
10 min read

Ella Miami Beach: 2026 North Beach Pre-Construction Buyer's Guide

Constellation Group, The Boschetti Group, and Vietmar are building a 10-story, 103-residence Arquitectonica-designed condo at 6940 Abbott Avenue in North Beach, with Interiors by Steven G and Ortega Construction. Topped off in March 2026 at about 70% sold; the developer anticipates delivery in early 2027.

pre-constructionellanorth-beach+5
Pre Construction
June 22, 2026
13 min read

Faena Residences Miami: Pre-Construction Buyer's Guide (2026)

Faena Residences Miami, Alan Faena's first standalone condo project, pairs two Rafael Vinoly towers on the north bank of the Miami River with a 45,000-square-foot sky bridge. The project closed an $817 million construction loan in October 2026, the largest in Florida history. Pricing was reported from $1.3M at launch, and completion is targeted for early 2030.

pre-constructionfaenabranded-residences+6
Luxury Living
June 22, 2026
12 min read

Harborview Fisher Island: 2026 Buyer's Guide

Harborview -- the 20-residence low-rise cluster of four three-story Mediterranean Revival buildings at 4411-4731 Fisher Island Drive, completed in 1989 -- pairs marina-fronting 2,744-square-foot three-bedroom plans with full Fisher Island Club access.

fisher-islandharborviewluxury-condos+4
Pre Construction
June 22, 2026
11 min read

HOUSE by Shigeru Ban Miami: 2026 Pre-Construction Buyer's Guide to Florida's First Shigeru Ban Building

HOUSE by Shigeru Ban is the Pritzker laureate's first project in Florida: a planned 12-story, 320-residence biophilic condominium at 237 NE 54th Street in Upper Buena Vista, just north of the Miami Design District, developed by Yakol Capital Partners. As of late October 2026 it is still pre-construction, with no groundbreaking reported.

pre-constructionhouse-by-shigeru-banshigeru-ban+5
Pre Construction
June 22, 2026
11 min read

La Mare Bay Harbor Islands: Pre-Construction Buyer's Guide (2026)

La Mare Bay Harbor Islands, marketed as the Regency Collection, is Regency Development Group's 33-residence, Kobi Karp-designed condo under construction at 9927 East Bay Harbor Drive, with Debora Aguiar interiors, private boat slips and a rooftop infinity pool. No completion date has been confirmed.

pre-constructionbay-harbor-islandsla-mare+5